BrasAlpla, world leader in the development and production of plastic packaging solutions, had its new manufacturing unit completed in 2011. The Alpla Duque de Caxias was developed in the Design-build system, in which Libercon was responsible for the development of projects and construction of the enterprise. With more than 7,000 m², the project has an area for production and storage of the products produced, in addition to a structure to support industrial operations.
TECHNICAL INFORMATION
Classification: Plastic Injection Industry
Client: BrasAlpla
Location: Duque de Caxias - RJ
Built-up Area: 7.362 m²
Conclusion: October/2011
Hiring Model: Design-build | Fast Track